Concrete Calculator
Estimate the volume of concrete for a rectangular slab or round pour in cubic yards and cubic metres, with weight, bag counts and ready-mix cost.
Your estimate
Enter your measurements to see an estimate.
Estimate only. Verify dimensions, product data and local requirements before ordering, and consult a qualified professional where structure or code applies.
How to use this calculator
- What to measure
- Measure the length and width of the form, or the diameter of a round pour, along the inside faces. Measure thickness at several points and use the average, because subgrade is rarely flat.
- Units
- In Imperial mode enter plan dimensions in feet and thickness in inches. In metric mode use metres and centimetres. Fractions such as 3 1/2 are accepted.
- Reading the result
- Order ready-mix in cubic yards or cubic metres, rounded up to your supplier's increment. For small pours, compare the 80 lb and 60 lb bag counts. They are alternatives, so buy one or the other.
Formula
| Variable | Meaning |
|---|---|
| L, W | Length and width of a rectangle (ft or m) |
| D | Diameter of a round pour (ft or m) |
| T | Thickness, converted to ft or m |
| w | Wastage as a fraction (10% = 0.10) |
| y | Yield of one bag (ft³ or L) |
Rectangle V = L × W × T × (1 + w) Round V = π × D² ÷ 4 × T × (1 + w) Cubic yards = V(ft³) ÷ 27 Bags = ⌈ V ÷ y ⌉ Cost = V(yd³) × price per yd³
Thickness in inches is divided by 12 before multiplying. Price is applied to the unrounded volume, and each bag count is rounded up to a whole bag after wastage.
Worked example
A 20 ft × 10 ft rectangular slab, 4 in thick, with 10% wastage and ready-mix at $150/yd³.
- T = 4 ÷ 12 = 0.3333 ft
- V = 20 × 10 × 0.3333 × 1.10 = 73.333 ft³
- 73.333 ÷ 27 = 2.716 yd³ → 2.72 yd³
- 2.716 × 0.764555 = 2.077 m³ → 2.08 m³
- Cost = 2.716 × $150 = $407.41
- 80 lb bags = ⌈73.333 ÷ 0.60⌉ = ⌈122.2⌉ = 123
- 60 lb bags = ⌈73.333 ÷ 0.45⌉ = ⌈162.96⌉ = 163
| Concrete required | 2.72 yd³ |
|---|---|
| Metric volume | 2.08 m³ |
| Estimated material cost | $407.41 |
| Approximate 80 lb bags | 123 bags |
| Approximate 60 lb bags | 163 bags |
| Estimated weight | 11,000 lb |
| Plan area | 200.0 ft² |
Reference
| Use | Typical thickness | Volume per 100 ft² |
|---|---|---|
| Walkway or patio | 4 in (10 cm) | 1.23 yd³ (0.94 m³) |
| Driveway, cars | 5 in (12.5 cm) | 1.54 yd³ (1.18 m³) |
| Driveway, light trucks | 6 in (15 cm) | 1.85 yd³ (1.42 m³) |
| Shed base | 4 in (10 cm) | 1.23 yd³ (0.94 m³) |
Volumes exclude wastage. Thickness requirements vary by soil, load and local code.
Questions
How much wastage should I add for concrete?
Many contractors add 5–10% for uneven subgrade, form flex and spillage. Use the higher end when the base hasn't been compacted and screeded to grade.
When is bagged concrete more practical than ready-mix?
Bags suit small pours such as post footings or pads under about one cubic yard. Above that, mixing time and consistency usually favour a ready-mix truck, though many suppliers charge a short-load fee for small orders.
Why does the weight matter?
Weight helps you check vehicle, trailer and wheelbarrow limits for bagged mix, and gives a rough load figure for a suspended form. It uses the density in the form, so adjust it for lightweight mixes.